Development in Dholera
Development
The Development Plan for DSIR has been prepared and sanctioned by DSIRDA. In Phase-1, Activation Area of 22.5 sq km is going to be completed. Some highlights given below:
Overall Trunk infrastructure projects in Phase-1
- Roads and services/utilities
- Raw water transmission line from source
- Waste water treatment and recycle plant
- Solid waste management
- Power, Transmission and Duct network
- Information Communication Technology (ICT) network
- Administrative and Business Centre of Dholera(ABCD)
- Cycle track with shaded walkway
- Artificial River with riverfront development
- Wifi network
External infrastructure projects
- River binding for flood management
- Ahmedabad – Dholera Expressway
- Ahmedabad – Dholera MRTS
- Freight rail from DSIR to Bhimnath Junction
- Dholera International Airport
- CNG Port Terminal
- Delhi-Mumbai Industrial Corridor
Development in Dholera
Developement
The Development Plan for DSIR has been prepared and sanctioned by DSIRDA. In Phase-1, Activation Area of 22.5 sqkm is going to be completed. Some highlights given below:
Roads & Services in Activation Area
- 72KM OF ROADS
- Integrated Signal System
- Security & Surveillance
- Real Time Information
- Shaded Pedestrian
- Dedicated Cycle Track
- Traffic Management
Sewage Treatment Plant & Common Efflument Treatment Plant (CETP)
- 72KM OF ROADS
- Shaded Pedestrian
- Integrated Signal System
Water Treatment Plant
- 72KM OF ROADS
- Shaded Pedestrian
- Integrated Signal System
96 Thousands
Resident Population
76 Thousands
Total Jobs in Dholera